Nail Machine Maintenance And After-sales Maintenance

Feb 17, 2024 Leave a message

Nail machine maintenance and after-sales maintenance

The daily maintenance of the nailing machine is the top priority in daily work, if the maintenance is good, it can be used for at least 5 years, thus greatly reducing unnecessary costs, and further purchasing new scheduling machines and production lines to improve productivity.

 

The daily maintenance of the nailing machine is to extend the service life of the nailing machine, and to ensure the pass rate of the nails produced. After all, in addition to minor faults, the defective nails are inevitable.

 

1: After the new nail machine is installed, it must be operated with empty load for half an hour, this is because the new equipment is not run in, no-load operation is actually to play a running-in role, this half an hour to refuel frequently to ensure that the active parts have sufficient lubrication.

 

2: In daily production, it is necessary to pay attention to lubrication, the number of oil injection per shift shall not be less than three times, the lubricant is based on butter, add some butter before starting, and then fill oil at irregular intervals in production.

 

3: In the production, it is necessary to pay attention to whether the fastening screws are loose, because the working principle of the nailing machine leads to a certain vibration of the nailing opportunity, then this vibration may lead to the loosening of the screws in some positions, if ignored for a long time, it will lead to a variety of failures.

 

4: After the end of production, it is necessary to clean up the residual iron slag and nails on the equipment to prevent them from entering the inside of the equipment, resulting in the wear of various active parts and avoid unnecessary damage.